So the skylights are in. VERY easy. Second one took about 20 mins, first one about an hour. Things to watch.
3.5 mm pan head screws need to be long (mine are 50 mm although my roof is 9 mm thicker due to ply lining so you might get by with 45 mm) so special order for them!
Jigsaw blade needs to be long enough to cut both sides and they don’t make HSS ones with enough teeth per inch and also long enough to cut thin aluminium, so a fine HCS wood one was used. Just long enough. On the second skylight I marked all the holes and then used a 10 mm drill and then cut round with the jigsaw. I cut centre to centre of the holes. Using the 10 mm was easier than notching the roof as per the pics and the first one. Enjoy.